The memorial capsule in honor of dismantling Central Stadium will be laid at the end of December this year.
Today, December 15, it was announced the completion of work at the Central Stadium, which precede the construction of a new sports arena “victory” for the 2018 World Cup. Traditionally before the New Year ceremony to lay the capsule in the foundation of a new stadium.
General Contractor led clock dismantling of the Central Stadium. It was attended by 17 employees of “reform”, 4 units of specialized equipment, 16 trucks. They have taken 86 th. Tons of trash, 10 th. Tons of old asphalt, piles of old 960, 350 tons of scrap metal.
Earlier IA “Volgograd 34″ reported that the government contract for the construction of the sports arena “Victory” between the customer company “Sport-in” and the general contractor “Stroytransgaz» , has already been signed. The general contractor on a competitive basis, make a list of subcontractors.
It is already known that the new stadium, which area would take more 20 ha , will cost the Government of the Russian Federation 16.5 billion rubles and will be commissioned in November 25, 2017. Experts estimate that the construction of “Victory” will require about 1 thousand. Piles, more than 700 thousand. Tons of reinforcement, and more than 110 thousand. Tons of concrete, 10 thousand. Tons of steel, and other related materials. All this will be done at the local enterprises. Thus, the cement and concrete industries provide several Volgograd, Volga and Mikhailovka, and the sand will be shipped from the Oryol region.
In parallel with the construction of “Victory” will be developed areas such as transport and logistics, security, hospitality.
Earlier social activists at the round table discussed the level of preparedness of Volgograd take the 2018 World Cup matches, and noted that it has increased significantly compared with the conclusion of experts in June 2014. Then the experts felt that the hero city on terms and quality ranks 10th.
In addition to the sports arena in the regional center will be built four complex housing facilities, 11 road infrastructure will be reconstructed hotel fund. All this will increase the number of jobs in the region. Moreover, the operation of the stadium will cost 18-20 million. Rubles per month. In other words, “Victory” will be the main subject of the sports cluster.
No comments:
Post a Comment